The Harrow Glazing Brief
The owner wanted every window in a tenanted office building replaced, without moving the tenants out.
Harrow Glazing Project Overview
We replaced over 100 single glazed aluminium windows with double glazed aluminium systems on an office building in Harrow. The building stayed occupied throughout, with the work phased floor by floor.
Once each window was in, our team made good the opening from the inside, plastering and painting so every office was left finished.
Our project manager coordinated the window subcontractor, the scaffolding team and our own making good team, and liaised with each tenant to keep every floor on schedule.
Scope of Works at Harrow Glazing
- 01 Removal of Existing Single Glazed Aluminium Windows
- 02 Supply & Installation of Over 100 Double Glazed Aluminium Units
- 03 External Scaffolding
- 04 Planning Permission
- 05 External Sealing & Weatherproofing
- 06 Internal Making Good
- 07 Internal Redecoration
- 08 Phased Installation Across an Occupied Building
- Your Project A Similar Scope in Mind? Discuss Your Project
Replacing Over 100 Windows in an Occupied Office
You cannot leave an opening in an occupied office. Each window was taken out and its replacement fitted in the same session, and the work was phased floor by floor so each tenant was disrupted once.
Scaffolding went round the whole building, while the car park and entrances stayed open to tenants at all times. With over 100 units, every one had to be fitted, sealed and made good to the same standard, and the offices cleaned up as we went.
Approvals for Harrow Glazing
- Planning Permission
- The window specification needed planning approval before materials could be ordered. We submitted early and it was approved without issue.
- Building Control
- The window replacement was inspected and signed off by building control on completion.
The Finished Project at Harrow Glazing
Over 100 single glazed windows replaced with double glazed aluminium systems, and a refreshed exterior, with tenants working in the building the whole time. Inside, we carried out redecoration works alongside the installation.
Handed over in February 2021.
“The job was handled professionally, commenced and completed on time, efficiently very tidy. The team kept the car park accessible all the time while the work was being done. Highly recommend the Company.”